Project Specification:Tunnel – NSC N105 at Suffolk Walk / Novena Rise
Main Contractor: Penta – Bachy Joint Venture
Consultant: Mott Macdonald Singapore Pte Ltd
Commencement Date: 1/8/2018
Project Specification:Tunnel – NSC N105 at Suffolk Walk / Novena Rise
Main Contractor: Penta – Bachy Joint Venture
Consultant: Mott Macdonald Singapore Pte Ltd
Commencement Date: 1/8/2018